
Cold temperatures slow the speed of concrete curing, causing cost increases and schedule delays.
Cold temperatures slow the speed of concrete curing, causing cost increases and schedule delays. Wacker Neuson hydronic heaters accelerate the cure rate by raising the concrete temperature to an ideal 65-75°F, reducing costs and delays.